G-18 Installs architectural millwork products and mouldings

Major work activity G – Performs on-site assembly and installation · Weight: 32% · 5 of the 120 exam questions

Architectural millwork arriving in sections is assembled and installed with various techniques, fasteners and adhesives; mouldings are often added to improve the final appearance.

Sub-tasks

Installing architectural millwork and mouldings

Assembling and fastening architectural millwork on site, installing mouldings, and finalizing the installation, including passage doors.

Key points

Overview

Cabinetmakers use a range of techniques, fasteners and adhesives to assemble and install architectural millwork products that arrive on site in sections. Mouldings are often installed to improve the overall appearance of the finished product.

G-18.01 Performs final on-site assembly and fastening of architectural millwork products

What you do

  • Choose and use tools and equipment that suit the application.
  • Assess site conditions: record temperature and humidity, and assess mechanical, electrical and building conditions.
  • Protect floors and surrounding areas from damage during delivery and installation.
  • Check the site for installation conditions.
  • Locate structural components and utilities.
  • Assemble architectural components before installation, following the shop drawings.
  • Fit, level and fasten millwork products to walls, ceiling and floor so they are flush, square and aligned.
  • Install passage doors and hardware according to the door and hardware schedule and the shop drawings.
  • Apply panel adhesives, sealants, glues and caulking to industry standards.

What you need to know

  • Architectural millwork products, hardware, fasteners and blind fasteners.
  • Types of joints, and adhesives, sealants, glues and caulking.
  • Procedures for wall and ceiling construction and finish.
  • Tools, equipment and procedures for final on-site assembly and fastening.
  • How to locate utilities inside walls, ceilings and floors, and how to locate structural components.

Range of variables

  • Architectural millwork products include: wainscoting, panelling, doors, frames, store fixtures, wood-framed windows.
  • Installation conditions include: level floor, plumb walls, square corners.
  • Structural components include: studs, joists, trusses, blocking.
  • Utilities include: in-floor heating, electrical wiring, data cables, plumbing components.
  • Fasteners include: screws, toggles, wall anchors, nails.
  • Blind fasteners include: ledger strips, French cleats, keyhole slots.
  • Types of joints include: mitre, cope, butt, scarf.
  • Tools and equipment include: drills, air nailers, levels, saws, ladders, staging.
  • Industry standards include: AWMAC, AWI, WI, CKCA, shop-specific standard.

G-18.02 Installs mouldings

What you do

  • Choose and use tools and equipment that suit the application.
  • Locate structural components.
  • Lay out mouldings and wainscoting from the drawings so they look balanced.
  • Cut and cope mouldings so the joints are tight.
  • Position and secure mouldings with adhesives and fasteners, following industry standards.
  • Hide nail and screw holes with colour-match putty, caulking and wax (lacquer) sticks.

What you need to know

  • Types of mouldings; adhesives, sealants, glues and caulking.
  • Wainscoting and design styles.
  • Tools, equipment and procedures for installing mouldings; types of joints and their applications.

Range of variables

  • Mouldings include: baseboard, casing, crown, chair rail, decorative trims.
  • Tools and equipment include: mitre saws, coping saws, table saws, pneumatic tools, levels, caulking guns.
  • Structural components include: studs, joists, trusses.
  • Types of joints include: mitre, cope, butt, scarf.

G-18.03 Finalizes installation of architectural millwork products and mouldings

What you do

  • Choose and use tools and equipment that suit the application.
  • Check and adjust doors, drawer fronts and hardware to industry standards, so they look better and run smoothly.
  • Reinstall removable panels and install grommets once the utilities are in.
  • Find and repair imperfections to industry standards.
  • Finish installing passage doors by fitting the passage door components.
  • Clean the millwork products, passage doors and worksite using cleaners.
  • Apply caulking and silicone to keep water from damaging millwork products, making sure they are compatible with the wall finish.

What you need to know

  • Architectural millwork products and mouldings.
  • Why it matters to document humidity, temperature and the condition of the work site, the millwork products and the moulding.
  • Adhesives, sealants, glues and caulking; cleaners.
  • Tools, equipment and procedures for finalizing the installation.

Range of variables

  • Tools and equipment include: drills, levels, screwdrivers, caulking guns, paint brushes, rollers, ladders, staging.
  • Utilities include: data cables, electrical, telephone.
  • Imperfections include: scratches, dents, chips, damaged components.
  • Passage door components include: door stops, handles, glass, kick plates, locksets, passage sets, hinges, panic bars, overhead closers.
  • Cleaners include: methyl hydrate, thinners, solvents, green cleaners, soap and water.

Source: Red Seal Occupational Standard – Cabinetmaker, Task G-18 (pp. 122–127).

In the study app

28 flashcards and 34 practice questions cover this task in the interactive app. Open this task in the study app

Glossary terms for this task

Reference articles for this task

Sources cited on this page

Open this task in the study app